You came earlier than we expected and finished the work.
HelloThis is a cooling system! ​This posting site is…This is the site of Pagora site.​The remodeling of Singwang Church is in full swing.The installation site is 13m wide and 4m protruding underground building.​A lot of rain and snow in general sky training. And it's hard to stand the strong wind, so I'm going to go […]

Hello
This is a cooling system!


This posting site is…
This is the site of Pagora site.

The remodeling of Singwang Church is in full swing.
The installation site is 13m wide and 4m protruding underground building.

A lot of rain and snow in general sky training. And it's hard to stand the strong wind, so I'm going to go to Pagora.
It's going to be constructed!!
The first rail to proceed is being secured.
In addition to securing the rail, install a guide that holds the rail to the rail.
The motor was also fastened before the fabric was fastened.
It's time for the main rail team.
This is the hardest task.
The length of this site is long, but the protruding length is a little short, so you only need to pay attention 10 times and work hard.
If the projection is more than 6 meters long, you have to eat.
It's going to be hard.

I'm sighing because I have to do it without resting once I feel sorry for it!!
Fabric tightening completed
About five to six years ago, the fabric was installed between the guide and the guide with a width of 60cm.
It's easy to work, but it's leaking between the guide and the fabric, so I remember that as well.
Now that the fabric is made in one piece, there is no rain as it is, so you don't have to worry about it!

Four meters out, when it's folded, it's about 80 centimeters down.

The Pagora motor has been set up and the upper water pan has been finished.

It is a form of falling water directly out of the building to prevent rainwater from entering the building.

I can't take a lot of pictures when I'm working on Pagora.
I can't afford to take pictures because I'm concentrating on my work.


Here are some examples of pension skyning installations!!

Corona seems to be slowing down, but it seems like the 4th trend is going on again.
I'm worried about the pensioners who are ready to meet you.
But you have to dress up nicely to come back.
We'll do our best.

The scene is in the West Sea!!

West Sea Pension Skyning
I can see the German village in the distance.
About 7 years ago, I drank beer over there and ordered jjajangmyun at Cheolsu's house.
Young people these days don't know who Chul-soo is, do they?
Total skyning to be installed is 2nd floor, 4th building.
1st floor maintenance room 1st building
A total of 5 dongs.
The second floor has a total projection of 2.5 meters.The horizontal length is a 파고라 little different!
The estimate and the actual measurement were before the railing was glazed.
So I thought I could lift up the skyning a little bit and arrived.
You came earlier than we expected and finished the work.

I bet one and two.
Up to three.
Red Hill Pension
I'm hanging four, putting in the front race, finishing up the electricity.
The sun is starting to fall.
We haven't even started the management yet.
Installation finishing steps to avoid rain and sun damage to the maintenance room.

If we want to get to Yangpyeong, we'll have to finish before sunset.
I just focus on my work without pictures.

I just introduce it like this.
This dish is also newly decorated inside and outside, so please visit us.

답글 남기기

이메일 주소를 발행하지 않을 것입니다. 필수 항목은 *(으)로 표시합니다